If you had an account on forum.suprbay.org with at least one post, you do not need to re-register. Your account is still active and your Suprbay username and password will work.

Syria: National cadres install second wind turbine to generate power in Homs
#1
WDRVM company for alternative energy and heavy industries in Hassia Industrial city, Homs countryside has announced that Syrian cadres have been able to install the second wind turbine for generating electric power in Syria.

The company, in a press statement, said that the manufacturing and installation have been completely carried in al-Dahabiyeh area, Homs western countryside on Homs-Tartous highway.

It noted that the turbine will feed the general power network in Syria with a capacity of 2,5 megawatts, so the full capacity with the first wind turbine will become 5 megawatts.

In spite of all harsh circumstances, the unilateral coercive measures and the economic siege imposed on the Syrian people, the company has been able to complete manufacturing the turbine with all of its components, including the tower, the blades and the remote-controls with high accuracy that is similar to the international standards.



http://www.sana.sy/en/?p=246238
Reply


Possibly Related Threads…
Thread Author Replies Views Last Post
  US continues to support terrorists in Syria, Russia says Resurgence 0 92 Jan 26, 2022, 21:30 pm
Last Post: Resurgence
  China built more offshore wind in 2021 than every other country built in 5 years Resurgence 0 96 Jan 26, 2022, 21:24 pm
Last Post: Resurgence
  Indian power company invites bids to build 900MW of solar parks in Cuba Resurgence 0 138 Jan 20, 2022, 20:14 pm
Last Post: Resurgence
  Thailand: Highly endangered Indochinese tigers killed in national park Resurgence 0 131 Jan 20, 2022, 02:17 am
Last Post: Resurgence
  Iran to pilot national cryptocurrency soon Resurgence 0 158 Jan 17, 2022, 21:32 pm
Last Post: Resurgence



Users browsing this thread: 1 Guest(s)